This page is about Bangor in Gwynedd, north Wales. Planning applications in Bangor are decided by Cyngor Gwynedd (Gwynedd Council). Land within Eryri National Park, which begins a few miles to the south and east, is decided by the Eryri National Park Authority instead, and Menai Bridge and the rest of Anglesey fall to Isle of Anglesey County Council. The council’s planning pages explain how to apply and search applications.
Bangor is in Wales, so Welsh planning law and policy apply and the English NPPF does not. Applications are made under the Town and Country Planning Act 1990 as it applies in Wales and assessed against Future Wales: The National Plan 2040, Planning Policy Wales (Edition 12) and the Technical Advice Notes. The Planning (Wales) Act 2026, which received Royal Assent in April 2026, is expected to begin coming into force from October 2027.
The Joint LDP and the new Gwynedd plan
The Anglesey and Gwynedd Joint Local Development Plan, adopted on 31 July 2017, remains the local policy framework for decisions. Gwynedd is now preparing its own Gwynedd Local Development Plan for 2024 to 2039, which will replace the joint plan in the council’s area once adopted.
HMOs: always need permission in Wales
Bangor has a large student population because of Bangor University. In Wales, changing a house (C3) into a small HMO (C4) always needs planning permission. Applications in Bangor are assessed against the Joint LDP’s policies on HMOs and conversions and the council’s guidance, which look at the concentration of HMOs nearby, residential amenity and parking. Larger HMOs need permission too, and licensing is separate.
Second homes and holiday lets
Gwynedd made an Article 4 Direction to control changes of use from main homes to second homes and holiday lets, but the July 2024 decision to confirm it was quashed by the courts, and on 6 February 2026 permission to appeal to the Court of Appeal was refused. The direction is therefore not in force, and those changes of use again have permitted development rights. Where planning permission is needed for holiday accommodation, the council’s guidance uses a combined 15% threshold for second homes and holiday lets.
Heritage
Bangor Cathedral and many buildings in the upper and lower town and around the university are listed, and the city has conservation areas. Listed buildings in Wales are designated by Cadw. In Wales, demolition in a conservation area needs conservation area consent, and works affecting a listed building need listed building consent.
Common projects in Bangor
- HMO proposals, which always need permission in Wales
- Extensions and loft conversions on terraced houses in Upper Bangor and Hirael
- Alterations to listed buildings
- Holiday accommodation proposals
- Sites near the Eryri National Park boundary
How we can help
We advise on planning permission in Bangor and across Gwynedd, including HMO planning, householder applications, holiday accommodation, listed building consent and appeals. We confirm whether the site is in Gwynedd’s planning area or Eryri National Park and explain how Welsh policy and the Joint LDP apply.
We cannot guarantee that Cyngor Gwynedd, or an Inspector on appeal, will grant permission.
What to send us about a Bangor project
Use the form below to send us the property address in Bangor, a short description of what you would like to build or change, and any drawings, photos or previous decision notices you have. Please confirm whether the property is inside Eryri National Park, as a different authority decides there.
Planning policies and validation requirements can change. We confirm the relevant local authority and current policy position for each instruction. A city service page does not represent a staffed local office.
Ask about planning in Bangor
Tell us about the property and what has happened so far. A senior planning consultant will review your enquiry and explain your options and the next steps.