Planning applications in Bridgend are decided by Bridgend County Borough Council, which also covers Porthcawl, Maesteg, Pencoed and the Llynfi, Garw and Ogmore valleys. The council’s planning and building control pages explain how to apply and search applications.
Bridgend is in Wales, so Welsh planning law and policy apply and the English NPPF does not. Applications are made under the Town and Country Planning Act 1990 as it applies in Wales and assessed against Future Wales: The National Plan 2040, Planning Policy Wales (Edition 12) and the Technical Advice Notes. The Planning (Wales) Act 2026, which received Royal Assent in April 2026, is expected to begin coming into force from October 2027.
The Replacement LDP
The council adopted its Replacement Local Development Plan 2018 to 2033 on 13 March 2024. It sets the strategy for growth, including regeneration in Bridgend town centre, Porthcawl waterfront and the valleys, and contains the detailed policies used to decide applications, with supplementary planning guidance.
HMOs: always need permission in Wales
In Wales, changing a house (C3) into a small HMO (C4) always needs planning permission. Replacement LDP Policy COM7 and the council’s HMO supplementary planning guidance are used to assess applications, looking at the concentration of HMOs nearby, residential amenity and parking. Where an HMO would be in or affect a conservation area, it must preserve or enhance the area’s character, with a heritage impact assessment. Larger HMOs need permission too, and licensing is separate.
Heritage
The county borough has 16 conservation areas, 373 listed buildings and structures, 60 scheduled monuments and five historic parks and gardens, according to the council. In Wales, demolition in a conservation area needs conservation area consent, and permitted development rights are narrower. Listed buildings in Wales are designated by Cadw, and works affecting their character need listed building consent from the council. The Merthyr Mawr and Kenfig dunes on the coast are also protected for their wildlife.
Common projects in Bridgend
- HMO proposals, which always need permission in Wales
- Extensions, dormers and loft conversions on terraced houses in the valleys
- Alterations to buildings in conservation areas and to listed buildings
- Coastal proposals in Porthcawl
- Changes of use in town centres
How we can help
We advise on planning permission in Bridgend, including HMO planning, householder applications, change of use, listed building consent and appeals. We explain how Future Wales, Planning Policy Wales and the Replacement LDP apply to the site.
We cannot guarantee that Bridgend County Borough Council, or an Inspector on appeal, will grant permission.
What to send us about a Bridgend project
Use the form below to send us the property address in Bridgend, a short description of what you would like to build or change, and any drawings, photos or previous decision notices you have. If you are planning an HMO, tell us about other shared houses nearby, as concentration is assessed.
Planning policies and validation requirements can change. We confirm the relevant local authority and current policy position for each instruction. A city service page does not represent a staffed local office.
Ask about planning in Bridgend
Tell us about the property and what has happened so far. A senior planning consultant will review your enquiry and explain your options and the next steps.