Planning Permission & Planning Consultants in London

Independent advice for planning applications, feasibility, change of use, retrospective proposals and appeals.

Request planning advice

Planning permission in London is decided in layers. Most applications are determined by the 32 London boroughs or the City of London, against that authority's Local Plan and the Mayor's London Plan. In two mayoral development corporation areas, the local planning authority is the London Legacy Development Corporation or the Old Oak and Park Royal Development Corporation. For strategic applications the Mayor of London can become involved, and in some cases can take over the decision.

This is therefore not a single "London council" system. A house in Islington, a shop in Croydon and a riverside site in the Legacy Corporation area will be assessed by different authorities, against different local policies, even though all of them also have to apply the London Plan.

The development plan in London

The adopted London Plan is still the London Plan 2021, published in March 2021. It is part of the statutory development plan for every London planning authority and remains the operative spatial development strategy, with a time horizon to 2041. It includes policies on housing design and standards, affordable housing, opportunity areas, the Central Activities Zone, Green Belt and Metropolitan Open Land, heritage, transport, air quality and climate.

A replacement Draft London Plan was published for consultation on 16 July 2026, with consultation running to 15 October 2026. City Hall's programme is for examination in 2027 and adoption in early 2028. Until a replacement is adopted, the 2021 Plan remains the plan that has to be applied. The draft can be a material consideration, but it does not yet carry the weight of an adopted plan, and individual draft policies should not be treated as if they were already in force.

Each borough also has its own Local Plan, and some areas have made neighbourhood plans. The starting point for any application is therefore: which planning authority; which Local Plan; which London Plan policies; and whether a neighbourhood plan or opportunity-area framework also applies.

Article 4 directions, HMOs and conservation areas

Many London boroughs have made Article 4 directions withdrawing the permitted development right to change a C3 dwellinghouse to a C4 small HMO (three to six occupiers). Some of those directions are borough-wide; others cover selected wards or streets. The position is not the same in every borough, and it changes, so the current direction and map must be checked for the address. A larger HMO of seven or more occupiers is usually sui generis and needs planning permission in any event.

Conservation areas, listed buildings, locally listed buildings, archaeological priority areas and World Heritage Sites are widespread. Every borough has designated conservation areas. In a conservation area, many householder permitted development rights are more limited — for example, a loft enlargement under Class B is not permitted development on Article 2(3) land, which includes conservation areas. Some boroughs have additional Article 4 directions in conservation areas controlling windows, doors, roof alterations or front boundaries.

Front-garden parking, basement excavations, mansion-block alterations and change of use in town centres or the Central Activities Zone are all areas where London-specific policy often goes beyond the national baseline. Early advice should identify those designations before drawings are finalised.

Common projects and who to apply to

House extensions, loft conversions, outbuildings, certificates of lawfulness, changes of use, Class MA commercial-to-residential prior approval, new dwellings and appeals are all regularly dealt with in London, but the receiving authority is the borough (or mayoral development corporation) for the site. If you are unsure which authority it is, the address and a clear site plan are the place to start.

Statutory periods in England are generally 8 weeks for most applications and 13 weeks for major development, unless a longer period is agreed. Boroughs also have local validation lists, so an application that would be valid in one authority can be invalid in another until further reports are supplied.

How we can assist

UK Planning Permission Ltd is registered at 124 City Road, London EC1V 2NX. We advise homeowners, landlords, businesses and developers on planning permission in London, including feasibility, applications, certificates of lawfulness, prior approval and appeals. We will tell you which authority is likely to decide the application, which development-plan documents apply, and whether an Article 4 direction or heritage designation is likely to shape the route.

We do not guarantee that permission will be granted. Decisions are made by the relevant London planning authority, the Mayor in strategic cases, or a Planning Inspector on appeal.

Sources checked (November 2026)

  • Greater London Authority, The London Plan (adopted March 2021); Draft London Plan consultation 16 July to 15 October 2026, with examination programmed for 2027 and adoption expected early 2028
  • Town and Country Planning (General Permitted Development) (England) Order 2015, including Article 2(3) land and Class B
  • Individual London borough Article 4 direction maps (to be checked for the site address)

Planning policies and validation requirements can change. We confirm the relevant local authority and current policy position for each instruction. A city service page does not represent a staffed local office.