Retrospective Planning Permission: What to Do If You’ve Built Without Permission
Updated November 2026. This covers England, with notes on Wales, Scotland and Northern Ireland.
Maybe a buyer’s solicitor has asked for a planning permission you don’t have. Maybe a neighbour has complained, or a letter has arrived from the council’s planning enforcement team. Either way, the situation can usually be resolved. This guide explains the options in the order to consider them.
Is building without planning permission illegal?
In most cases, carrying out development without planning permission isn’t a criminal offence in itself. It’s a breach of planning control, and the council can choose whether to take enforcement action. There are important exceptions:
- Unauthorised works to a listed building are a criminal offence.
- Ignoring an enforcement notice once it has taken effect is a criminal offence.
So the risk grows the longer a problem is ignored after the council gets involved.
Step 1: Check whether you actually needed permission
Before applying for anything, check whether the work was permitted development. Many rear extensions, loft conversions and garden buildings at houses in England don’t need an application if they meet the limits in the General Permitted Development Order 2015. Also check whether a change of use stayed within the same use class. If the work was lawful, you may not need retrospective permission at all, but you may want a certificate to prove it (see Step 3).
Our free house extensions guide sets out the permitted development limits, and the change of use guide explains the use classes.
Step 2: Check the enforcement time limits
In England, the Levelling-up and Regeneration Act 2023 changed the time limits in section 171B of the Town and Country Planning Act 1990 from 25 April 2024:
| When the breach happened | Time limit for enforcement in England |
|---|---|
| Building work substantially completed on or after 25 April 2024 | 10 years from substantial completion |
| Change of use to a single dwelling on or after 25 April 2024 | 10 years from the breach |
| Building work completed, or change of use to a single dwelling, before 25 April 2024 | The old 4-year limit still applies |
| Any other breach, such as other changes of use or breach of a condition | 10 years |
After the time limit has passed, the development generally becomes immune from enforcement. Exceptions apply, for example where the breach was deliberately concealed. In Wales, the 4-year limit for building work and for changes of use to a single dwelling still applies.
Step 3: If it’s old enough, apply for a certificate of lawfulness
If a development has existed long enough to be immune, you can apply for a certificate of lawfulness of existing use or development under section 191 of the 1990 Act. This is often the right answer when a sale is held up.
- You have to prove your case on the balance of probabilities.
- Useful evidence includes dated photographs, invoices, Building Regulations completion certificates, tenancy agreements, council tax or business rates records, and statutory declarations from people with first-hand knowledge.
- The council looks at the facts and the law, not whether it likes the development.
- In England, the fee is the same as the full planning application fee for that type of development.
See our certificate of lawfulness service.
Step 4: Make a retrospective planning application
If the work did need permission and isn’t immune, you can apply for planning permission for development already carried out (section 73A of the 1990 Act). The council assesses a retrospective application on its planning merits, like any other application. The fact that it has already been built doesn’t count for or against it.
What that means in practice:
- The fee is the same as a normal application. For an extension to one house in England, that’s £548, or £575 for applications made from 8 December 2026 (MHCLG fee tables). Gov.uk confirms that retrospective applications are subject to the normal application fee.
- Drawings must show what was actually built, measured accurately, not what was originally planned.
- Deal with the likely objections. If the council’s concern is overlooking, a privacy screen or obscure glazing may resolve it. You can propose changes as part of the application.
- Decision times are the same: 8 weeks for most householder and minor applications.
There’s no guarantee of approval. If it’s refused, the council may move to formal enforcement, so the quality of the application matters. Our retrospective planning permission service prepares the drawings, planning statement and supporting evidence.
Why applying early matters in England
Since 25 April 2024 there’s an important trap. If you made a retrospective application before the council issued an enforcement notice, you generally can’t appeal that notice on ground (a), the argument that planning permission should be granted (section 174(2A) of the 1990 Act, as amended). An exception applies where the notice was issued more than two years after the application stopped being under consideration. Your retrospective application, and any appeal against its refusal, is effectively your one chance to argue the planning merits. Make it a strong one.
What the council can do
Councils in England have a range of powers:
- Planning contravention notice: a formal request for information about the site.
- Enforcement warning notice (section 172ZA, England): introduced in 2024. The council can use one where it thinks permission would reasonably likely be granted, and invite you to apply within a set period. Issuing one counts as taking enforcement action.
- Enforcement notice: says what must be done, such as removal or alteration, and by when. You can appeal to the Planning Inspectorate, but the appeal must be made before the notice takes effect.
- Stop notice and temporary stop notice: these require an activity to stop quickly.
If you receive any of these, take advice straight away. Deadlines are short and can’t usually be extended. See our planning enforcement advice and planning appeals pages.
Selling a property with a planning problem
Buyers’ solicitors routinely check planning history. Common ways to resolve a problem are:
- confirm it was permitted development, and obtain a proposed or existing use certificate if useful
- apply for a certificate of lawfulness if the time limit has passed
- apply for retrospective permission
Solicitors sometimes suggest an indemnity insurance policy instead. Read the policy terms carefully before anyone contacts the council, and take legal advice.
Wales, Scotland and Northern Ireland
Each nation has its own enforcement rules and time limits, so don’t rely on the English 2024 changes outside England:
- Wales: section 171B keeps the 4-year limit for building work and for change of use to a single dwelling. The enforcement warning notice and ground (a) changes apply in England only.
- Scotland: enforcement is governed by the Town and Country Planning (Scotland) Act 1997, as amended.
- Northern Ireland: enforcement is governed by the Planning Act (Northern Ireland) 2011 and carried out by the 11 councils, with appeals to the Planning Appeals Commission.
We advise across the UK, including London, Manchester, Cardiff, Glasgow and Belfast.
Frequently asked questions
Can I get planning permission after building? Yes. In England you can apply under section 73A of the Town and Country Planning Act 1990. It’s judged on its planning merits, like any other application.
Is the fee higher for a retrospective application? No. The fee is the same as for the equivalent normal application.
What is the 10-year rule in planning? In England, for breaches from 25 April 2024 onwards, councils generally have 10 years to take enforcement action. Earlier building work and changes of use to a single dwelling keep the old 4-year limit.
Can a neighbour force me to take down an extension? Not directly. Only the council can take planning enforcement action, and it decides whether doing so is in the public interest.
What should I do if I receive an enforcement notice? Note the date it takes effect and get advice immediately. Any appeal has to reach the Planning Inspectorate before that date.
Had a letter from the council, or a sale on hold? Send us the address, photos of the work, roughly when it was done and any council correspondence. We’ll tell you whether you need retrospective permission, a lawful development certificate or nothing at all. Call 020 3951 1896, email info@ukplanningpermission.co.uk or use our contact form. See all our planning services.
This article is general information, not legal advice. Enforcement matters have strict deadlines, so get advice about your own situation promptly.
Sources (checked November 2026)
- Town and Country Planning Act 1990, sections 73A, 171B, 171C, 172, 172ZA, 174 and 191: legislation.gov.uk/ukpga/1990/8
- Levelling-up and Regeneration Act 2023, sections 115–118, and S.I. 2024/452 (commencement on 25 April 2024): legislation.gov.uk
- GOV.UK, Enforcement appeals: key changes under the Levelling-up and Regeneration Act
- GOV.UK, Fees for planning applications and Fees for planning applications in England from 8 December 2026